Upon creation of a Scheduled report, the report commits and runs based on the parameters set, based on the configured details. If necessary, changes to existing scheduled reports follow the same process as creating a scheduled report in edit mode.
- Load the record where the report resides.
- Navigate to Reports.
- Locate the report to edit.
- Click the pencil (✏️) icon.
- Follow the instructions found on the Scheduled Reports article to edit and reschedule the report.
- Remember to click the Save icon (💾) to commit the change(s).